Uniberp's Latest Project

Big Bag O' Skunks
Uniberp reports on his latest project:
I'm rehabbing a tattered 19th century cottage a block from Muskegon Lake, in a decent neighborhood of modest homes. I bought it for about $30 a foot, plus an oversized 28x30 garage on a double lot. I am 3 weeks into demolition. Triage demolition is a couple weeks to completion. It will require total replacement of the rear sill, which a 10x10 beam, notched for joists. I'll figure out how that will go together when I see it. Prep is supporting the back wall top plate, supporting the joists, then removing the wall pretty much entirely.The garage, although with a good slab and heavy fiberglass door, has severe roof rot, although the trusses are intact. I replaced 10 sections of decking( need 15 more), and will put a $1200 steel roof on it. Colonial Red, I think. 
I bought it because I am bored and bitter on weekends. Now, instead, it is all so familiar, as I drag myself to my old truck full of tools and drive a half hour to the job site. Once there it is fairly automatic. If I am strong and fresh I tackle an improvement. If not, I shovel and sweep mindlessly. I last about 6-7 hours, then confusion and tiredness forces a stop. 
The dump is 13 miles away and $25. I have 10 steel barrels on a 10x5 trailer that I fill and 2-wheel up the ramp. I fill them as best I can on Saturday afternoon and Sunday, and make it to the dump by 1 pm the following Saturday. Monday morning I go into work feeling stiff, but already knowing I did my own work for the week.  
It has real potential, as a flip, or a cottage, or for retirement. Space for a big garden, although very sandy. 2 block walk to the marinas, parks, bars and restaurants, but as yet I am too filthy to go anywhere but straight home to the shower.  
I should have the thing together with basic plumbing in a few weeks. I ripped it all out, since it was what rotted the back sill and floors. I have an electrician installing a new service and panel this week.  
Once that is in place, it will be functional, and design can begin. I have lots of extra time during the week to plan the engineering and layout. and that helps, because I am so sore I can only move slowly. It takes me a couple of days to recover fully, even though I use all the safety equipment: gloves, goggles, real respirator, hardhat, Still some gets through and gagging on dust is exhausting. 
I don't even want to talk about the skunk abatement, suffice to say that I believe I took out the entire regional population.

1 comment:

  1. You cannot be a witch doctor
    and inherit Seventh-Heaven, dood.
    Drop that like the skunks gettn loose and wiseabove.
    Lemme x-plane summore wisdom, brudda, that aint my brightness:

    Let this be your catalyst to Seventh-Heaven:

    'The more you shall honor Me,
    the more I shall bless you'
    -the Infant Jesus of Prague
    (<- Czech Republic, next to Russia)

    Love him or leave him or indifferent...
    better lissen to the Don:

    If you deny o'er-the-Hillary's evil,
    which most whorizontal demokrakkrs do,
    you cannot deny Hellfire
    which YOU send YOURSELF to.

    Yes, earthling, I was an NDE:
    the sights were beyond extreme.
    Choose Jesus.
    You'll be most happy you did.
    God bless your indelible soul.

    ReplyDelete