Uniberp at his Muskegon Cottage |
So here is what I've been working on, 3rd year. Finished (nearly) the new steel roof this past weekend.
In reality it only took like 6-8 working days to strip and replace the roof but i had long periods of recovery between so the roof took about 6 weeks.
The 5th and 6th pics show some the extent of the gutting inside, and all new sewer, plumbing, HVAC, 2 additional bedrooms upstairs,
It's still gonna take a lot to make it habitable. Siding done on 2 sides, the 4 sides showing are left to be done, about the same sq footage as already done.
18 foot cathedral ceiling. 1.5 bath. I demolished and removed ~30,000 pounds of debris (300 barrels, 10 at a time, to the county dump). Demolition is pretty much done, one section of ceramic floor to go.
Some floor joists had to be replaced, I may replace them all at some point. The upstairs is all new anyhow, so new joists and flooring.
It originally had 10 foot ceilings with a tall attic kneewall as well.
Double lot. 30 x 30 garage on the alley. 2 blocks from Lake Muskegon.
I got a DIY Foam-It spray insulation kit for the crawlspace foundation wall.
For the cost of a 2014 Chevy Suburban.
Plus $1500 property tax annually. Not really using any significant amount of utilities.
6 Attachments
He has a zillion times as much energy as I do. I might have had that much energy once, but it was a long time ago. Previous posts on this project.