What the Ojibwe Knew About America's Lost Copper Mines
Last Cartographer and Ageden Pro
Silicon Forest
If the type is too small, Ctrl+ is your friend
![]() |
| Jay Woiderski (left) presents a trophy to Austin Dreifuerst, who was crowned the 2025 Black Lake Sturgeon Shivaree King. Photo courtesy Jay Woideroski |
![]() |
| Path to the Gravely |
I suppose it's usually only once a year, but I got caught being casual again.I suppose it's because I only commit to a limited loss in each step that I do things so incrementally, that if I prepared properly and had a more confident view toward the future that I would prepare better, but it worked out anyhow, at least for this once more time.I left the Gravely out by the tree after digging a yard of dirt out where I'm going to move the shed, and was faced with retrieving it through 18 inches of snow. Fortunately the little Honda snowblower was able to cut this path. The Gravely also needed a new power switch so I got to put that in using gloved hands in 15 degree weather. Then I got it started (after a battery charge), decoupled it from the dirt wagon and backed it out through this trench.Found some bolts and attached the snow cannon. After that it was pretty much the old same thing. 52 year old tractor cutting through the Devil's Ice Cream Cake 300 feet down to the road. Made 4 passes (3 is sufficient but I had to come back up anyhow.) and did the neighbors sidewallk. Pretty much done for now. Forecast is only a couple inches more this week as the lake cools down.It's too cold to go get pics now, the next morning but maybe later. It's zero this next morning.
![]() |
| Shallotte River Swamp Park |
North Carolina’s Shallotte River Swamp Park is home to 12 alligators rescued from captivity. As the recent extreme weather system moved through the area, the water they inhabit froze over.So, rather than allow themselves to get trapped under the ice, or risk freezing in the colder air above, the alligators did this instead.They protruded just the tips of their noses through the surface as it iced over, allowing themselves to breathe while remaining mostly submerged.
![]() |
| Pergiel Building 1036 Butterworth St SW Grand Rapids, Michigan |
Diligent daughter and I were looking at the Pergiel building (zoom in and you can read the name in the stone near the top) on Google Maps the other day. Today we want to look at it again, but we can't remember where it is or what led us to it last time. Went and rooted through my files and couldn't find anything. Finally pulled up Google Maps and searched for Sacred Heart church. Then I remember that the building was built at an angle, and there was a big dirt parking lot there. I noticed Butterworth runs at an angle, so I pulled up the satellite view and presto - there it is.
I writing this down so I will have some record of where it is. My grandfather built this building to house his bakery before WW2. Rumor has it that back then he was a competitor to Sunshine, but then the war and rationing and the draft came along and running a bakery got to be pretty thin. My dad worked there for a while before the army gobbled him up and shipped him off to Alaska and the Pacific.
| Ambassador Bridge |
| Ambassador Bridge |
![]() |
| Hackley & Hume Historic Site |
We took a guided tour through the Hackley and Hume Houses the other day, big old woodworked like crazy, painted Victorians. Hackley really liked ornate wood and stained glass, Hume had a bunch of kids, so had more running room.Turns out those houses were built at the same time mine was. Mine has a new furnace.
![]() |
| Uniberp at his Muskegon Cottage |
So here is what I've been working on, 3rd year. Finished (nearly) the new steel roof this past weekend.
In reality it only took like 6-8 working days to strip and replace the roof but i had long periods of recovery between so the roof took about 6 weeks.
The 5th and 6th pics show some the extent of the gutting inside, and all new sewer, plumbing, HVAC, 2 additional bedrooms upstairs,
It's still gonna take a lot to make it habitable. Siding done on 2 sides, the 4 sides showing are left to be done, about the same sq footage as already done.
18 foot cathedral ceiling. 1.5 bath. I demolished and removed ~30,000 pounds of debris (300 barrels, 10 at a time, to the county dump). Demolition is pretty much done, one section of ceramic floor to go.
Some floor joists had to be replaced, I may replace them all at some point. The upstairs is all new anyhow, so new joists and flooring.
It originally had 10 foot ceilings with a tall attic kneewall as well.
Double lot. 30 x 30 garage on the alley. 2 blocks from Lake Muskegon.
I got a DIY Foam-It spray insulation kit for the crawlspace foundation wall.
For the cost of a 2014 Chevy Suburban.
Plus $1500 property tax annually. Not really using any significant amount of utilities.
6 Attachments
![]() |
| USS Edson Saginaw, Michigan |
![]() |
| Saginaw River, left, flowing into Saginaw Bay The industrial complex on the left is an electric power plant |
![]() |
| Stone Hills Estate, Grand Rapids Michigan |
![]() |
| A pair of v-belts |
![]() |
| Threshing at Malton (early 1950s) |
![]() |
| Factory machines driven by Line Shafts & Flat Belts |
![]() |
| Package Handling & Distribution Center Conveyor Belts |
![]() |
| Mine Conveyor Belt |
Triage continues. After finishing demolishing and replacing all the garage roof decking with 35 pieces of 1/2" OSB and covering with battened down roofing felt, which made it wind-and-watertight, and having heard that OSB can withstand a certain amount of exposure, I decided this weekend to take it easy and do cleanup and estimating, which included 2 trips to the dump to offload 1800 lbs of old roof. Will-calling a crate of new steel roof of 44 pieces 15 feet long weight 850 lbs, to save maybe $100 on delivery was not so smart, but using Egyptian lever and roller methodology got it off the trailer and stowed inside.Previous post on this project here.
What started out as the following day of survey turned pretty readily into resigned belly crawling in the 24 inch sand crawlspace, cutting away someones' misguided ambitious project of running 10 runs of romex through individually drilled holes, presumably to offer a semblance of code compliance. In order to position new joists for sistering along the old ones, a Bolivian jungle of old PVC water pipes also had to be hacked away.
A cleaner hole is left. One with better defined margins. The next steps seem a little more obvious. I look forward to next weekend.
![]() |
| Lake Muskegon, Michigan, looking East |
![]() |
| Big Bag O' Skunks |
I'm rehabbing a tattered 19th century cottage a block from Muskegon Lake, in a decent neighborhood of modest homes. I bought it for about $30 a foot, plus an oversized 28x30 garage on a double lot. I am 3 weeks into demolition. Triage demolition is a couple weeks to completion. It will require total replacement of the rear sill, which a 10x10 beam, notched for joists. I'll figure out how that will go together when I see it. Prep is supporting the back wall top plate, supporting the joists, then removing the wall pretty much entirely.The garage, although with a good slab and heavy fiberglass door, has severe roof rot, although the trusses are intact. I replaced 10 sections of decking( need 15 more), and will put a $1200 steel roof on it. Colonial Red, I think.
I bought it because I am bored and bitter on weekends. Now, instead, it is all so familiar, as I drag myself to my old truck full of tools and drive a half hour to the job site. Once there it is fairly automatic. If I am strong and fresh I tackle an improvement. If not, I shovel and sweep mindlessly. I last about 6-7 hours, then confusion and tiredness forces a stop.
The dump is 13 miles away and $25. I have 10 steel barrels on a 10x5 trailer that I fill and 2-wheel up the ramp. I fill them as best I can on Saturday afternoon and Sunday, and make it to the dump by 1 pm the following Saturday. Monday morning I go into work feeling stiff, but already knowing I did my own work for the week.
It has real potential, as a flip, or a cottage, or for retirement. Space for a big garden, although very sandy. 2 block walk to the marinas, parks, bars and restaurants, but as yet I am too filthy to go anywhere but straight home to the shower.
I should have the thing together with basic plumbing in a few weeks. I ripped it all out, since it was what rotted the back sill and floors. I have an electrician installing a new service and panel this week.
Once that is in place, it will be functional, and design can begin. I have lots of extra time during the week to plan the engineering and layout. and that helps, because I am so sore I can only move slowly. It takes me a couple of days to recover fully, even though I use all the safety equipment: gloves, goggles, real respirator, hardhat, Still some gets through and gagging on dust is exhausting.
I don't even want to talk about the skunk abatement, suffice to say that I believe I took out the entire regional population.